Beck Re-connected!
At the end of September 2019 the new channel was connected to the beck by the removal of the bunds upstream and downstream of the weir. Silt control measures were also deployed to reduce the impact on the main beck. The leat will still be supplied from the beck so at the upstream junction work has taken place to ensure the flow is maintained to neighbouring parties.
The weir has also been sympathetically restored, which should also help with improved water flow along the leat. A fish screen and eel bristle boards added as well. We also carried out a session of electrofishing to rescue fish and eels from the leat, releasing them safely to the main beck.