Farm Constructed Wetland Success!

This year the project worked with a farmer to reduce sediment and phosphate inputs into the River Crake by formalising a ditch system with a Farm Constructed Wetland. Results show the wetland has  made a reduction in phosphates by 76% in the water that reaches the River Crake!

 

Read more on this on the activity section https://ccc.scrt.co.uk/farm-constructed-wetlands-2019/